Project Facts
  • Over 1 acre with 1,800 tons of Under Slab Gravel Sub Base
  • 40' Deep Excavation with 46,000 CY (3,285 truck loads) of Material Exported
  • Over 1/4 mile of Under Slab Underdrain Piping
  • Connection to Denver Water, Sanitary and Storm Drain System
 
"Your team did an excellent job on 1800 excavation and utilities. The commitment from Belair to do the job right was greatly appreciated. Safe, efficient and high level of quality, which resulted in no injuries and/or quality issues. Belair did what they said they would do. Even more impressive is the fact that we were on a tight downtown site with little to no lay down area. Great performance all around."
 
  Project Portrait


The facility at 1800 Larimer is a 22 story, 500,000 square foot office complex that will be the new headquarters for Xcel Energy. The project is a Certified LEED Platinum Level project, one of the first in the Colorado region.

The site is located in downtown Denver and has four levels of underground parking. Various methods of shoring were used to ensure a safe excavation, including lag & beam and hydraulic shoring. Conventional excavation, as well as hydro excavation, was used to safely expose existing underground utilities to allow new services to be installed to the building.


     