1515 WYNKOOP
1515 Wynkoop - Denver, CO
The project involved the removal of an existing structure (Post Office), and the construction of a high end residential multi-level structure. The project was conducted in downtown Denver and included a 40’ deep shored underground parking facility.
Owner: Hines
General Contractor: Holder Construction
Project Facts:
62,000 cubic yards of excavation and haul of material, to include backfill of foundations.
40’ shored underground parking.
17,000 tons of recycled concrete and debris from previous structure.
Installation of integrated well-point dewatering system. Static water level at 27’.
Remaining Post Office Facility remained within 10’ of new structure.