1800 Larimer - Denver, CO

The facility at 1800 Larimer is a 22 story, 500,000 square foot office complex that will be the new headquarters for Xcel Energy. The project is a Certified LEED Platinum Level project, one of the first in the Colorado region. The site is located in downtown Denver and has four levels of underground parking. Various methods of shoring were used to ensure a safe excavation, including lag & beam and hydraulic shoring. Conventional excavation, as well as hydro excavation, was used to safely expose existing underground utilities to allow new services to be installed to the building.

Owner: Westfield Development

Contractor: M.A. Mortenson

Project Facts:

  • Over 1 acre with 1,800 tons of Under Slab Gravel Sub Base

  • 40’ Deep Excavation with 46,000 CY (3,285 truck loads) of Material Exported

  • Over a 1/4 mile of Under Slab Underdrain Piping

  • Connection to Denver Water, Sanitary and Storm Drain System