SKB - Waste Connections

SKB - Waste Connections - Leachate Forcemain

Owner: Waste Connections

Project Synopsis: This is a replacement of the existing leachate gravity discharge line with a dual wall (4” inside an 8”) HDPE forcemain.  Work included all pumps controls and electrical services.

Project Facts:

  • Work was performed within an active Landfill facility

  • Over one mile of 4” HDPE pipe was inserted into an 8” HDPE containment pipe.

  • Setting a 96” diameter concrete wet-well over 20 feet deep

  • Field applied coatings inside all concrete structures

  • Installed flowmeter system

  • Installed Tri - plex pump system

  • Control Panel with SCADA system

  • New electrical service

  • New connection to the Met Council waste water system.

  • Total Contract Value: $1.2 million.