SKB - Waste Connections
SKB - Waste Connections - Leachate Forcemain
Owner: Waste Connections
Project Synopsis: This is a replacement of the existing leachate gravity discharge line with a dual wall (4” inside an 8”) HDPE forcemain. Work included all pumps controls and electrical services.
Project Facts:
Work was performed within an active Landfill facility
Over one mile of 4” HDPE pipe was inserted into an 8” HDPE containment pipe.
Setting a 96” diameter concrete wet-well over 20 feet deep
Field applied coatings inside all concrete structures
Installed flowmeter system
Installed Tri - plex pump system
Control Panel with SCADA system
New electrical service
New connection to the Met Council waste water system.
Total Contract Value: $1.2 million.